© 2013 amnova, llc amnova llc innovative building concepts
redstone PURA™ system Installation Instructions
MATERIALS and TOOLS needed for application:
- redstone PURA™ board - redstone™ SPECIAL ADHESIVE S - redstone™ PRIMER (spray bottle or paint roller) - redstone™ MESH 165 - handsaw or jigsaw - notched trowel - sanding paper or sanding board
1. cut board with handsaw to desired size
2. apply redstone™ Special Adhesive S with a notched trowel onto the board
3. apply adhesive on entire surface
4. press board with moderate pressure onto wall
5. easily cut out openings for conduits, pipes and receptacles
6. equalize surface with a sanding paper or a sanding board
7. remove excessive dust and apply redstone™ Primer onto entire surface
PROCESSING:
Additional optional installation of redstone™MEGA: ... to improve surface for higher impact.
1. anchor redstone™ PURA with the use of wall anchors with large plastic washers
2. apply redstone™ Special Adhesive S with a notched trowel onto the MEGA board
3. apply adhesive on entire surface
4. press board with moderate pressure onto wall
5. for further instructions see redstone™MEGA installation